processing

President Barack Obama Visit to Kennedy Space Center (201104290023HQ)
www.blackholenews.net

President Barack Obama, First Lady Michelle Obama, daughters Malia, Sasha, and the First Lady’s mother Marian Robinson, are shown the space shuttle Atlantis during a tour of the Orbital Processing Facility by NASA Astronaut Janet Kavandi during their visit to the Kennedy Space Center in Cape Canaveral, Fla., Friday, April 29, 2011. Photo Credit: (NASA/Bill [...]

0
Like
Save
Obama Kennedy Space Center Visit (201004150003HQ)
www.blackholenews.net

President Barack Obama tours the commercial rocket processing facility of Space Exploration Technologies, known as SpaceX, along with Elon Musk, SpaceX CEO at Cape Canaveral Air Force Station, Cape Canaveral, Fla. on Thursday, April 15, 2010. Obama also visited the NASA Kennedy Space Center to deliver remarks on the bold new course the administration is [...]

0
Like
Save
RS-25D Engines at KSC (NASA, Space Launch System, 01/12/12)
www.blackholenews.net

RS-25D engines line the wall of the Engine Processing Facility at Kennedy Space Center, Fla. The 15 engines used during the Space Shuttle Program are being transfered to Stennis Space Center, Miss., where they will be stored for future use on NASA’s new heavy-lift rocket, the Space Launch System, which will carry NASA’s new Orion [...]

0
Like
Save
RS-25D Engine Awaits Shipment at KSC (NASA, Space Launch System, 01/12/12)
www.blackholenews.net

A RS-25D engine in the Engine Processing Facility at Kennedy Space Center, Fla., is awaiting placement in a transportation canister for shipment to Stennis Space Center in south Mississippi. The 15 RS-25D engines used during the Space Shuttle Program will be stored at Stennis for future use on NASA’s new heavy-lift rocket, the Space Launch [...]

0
Like
Save
UFO?
www.blackholenews.net

(Project 365 Day 92) I didn’t do any post-processing on this one aside from cropping. By: ToastyKen

0
Like
Save
Space Shuttle Endeavour (STS-134) Roll-over from Orbiter Processing Facility 2 to Vehicle Assembly Building at NASA KSC.
www.blackholenews.net

28 Feb 2011: DLR photographer Thilo Kranz is still at KSC and took these photos of Space Shuttle Endeavour’s (STS-134) Roll-over from Orbiter Processing Facility 2 to the Vehicle Assembly Building (VAB). There, the Shuttle will be attached to the pre-integrated Tank and boosters. STS-134 carries the european built Alpha Magnetic Spectrometer (AMS). Image Credit: [...]

0
Like
Save