Using new tools to look at the universe, says Patrick Brady, often has led to discoveries that change the course of science. History is full of examples. Galileo was the first person to use the telescope to view the cosmos, says Brady, a UWM professor of physics. His observations with the new technology led to the discovery of moons orbiting Jupiter and lent support to the heliocentric model of the solar system........ Read more…


ESA Venus Express Status Report No. 48 - Science Operations

14.12.2006 05:54 Space - Source: Venus Today

ESA Venus Express Status Report No. 48 - Science Operations

STATUS REPORT
Date Released: Monday, October 30, 2006
Source: ESA Venus Express Mission

10 Oct 2006 16:03

Report for Period 1 October to 7 October 2006

During the reporting period the mission operations have been conducted according to the plan. The ground and the space segment performance have been nominal.

The TT&C was reconfigured twice during the reporting period, to account for the decreasing separation angle from the Sun (as conjunction approaches).

The table below shows a chronology of the main activities in the reporting period:

MET (Day)DateDOYVPER#Main Activity32701/10/06274163Routine science operations
TM bit rate change to 57 kbps32802/10/06275164Routine science operations32903/10/06276165Routine science operations33004/10/06277166Routine science operations33105/10/06278167Routine science operations
TM bit rate change to 38 kbps
TC bit rate change to 1 kbps
Unused PMs switched off33206/10/06279168Routine science operations33307/10/06280169Routine science operations

At the end of the last Cebreros pass in the reporting period (DOY 280, 16:00z) Venus Express was orbiting Venus at 256 million km from the Earth. The one-way signal travel time was 853 seconds.

Payload Activities

ASPERA
The instrument is regularly operated as part of the routine plan.

MAG
The instrument is regularly operated as part of the routine plan.

PFS
This instrument remained inactive during the reporting period.

SPICAV
The instrument is regularly operated as part of the routine plan.

VeRA
The USO is nominally powered but muted.

VIRTIS
The instrument is regularly operated as part of the routine plan.

VMC
The instrument is regularly operated as part of the routine plan.

Mission Planning

Short Term Planning
Operations of STP22 have been completed successfully and the planning of STP23 (extended two extra passes, up to DOY 289) was completed in time. A pre-check of the payload requests for STP24 was also successful.

DSN key file for the ongoing Solar Corona observations has been produced and sent to DSN.

Preparations for the upcoming solar conjunction phase in October/November 2006 are ongoing. SOR for the upcoming conjunction platform MTL operations have been created and are to be planned in the next cycles.

Medium Term Planning
MTP08 was fully processed and a report generated.

Future Milestones

Throughout the next week short term planning for STP23 and first 2 orbits of STP024 will be performed.

TM bit rate change to 22 kbps will occur on 10 October.

SPS PIT 3-way D/L only (parallel to nominal Cebreros pass) test is scheduled for 5 October.

Hypnosis Downloads.com
Search our hypnosis downloads below or browse over 300 hypnosis downloads
Search for:

                              

                              

                  

Original text is here

www.blackholenews.net


Attorney Directory
Magnetic Therapy
Active How To
Life through the eyes of observer